This phase involves verifying that all supplied equipment and materials meet the specified requirements and are free of defects before installation.
Preparing the site for installation, including groundwork, foundations, and infrastructure setup. Equipment Placement: Positioning and securing the equipment as per the layout plans. Connections and Wiring: Making electrical, mechanical, and other necessary connections. Integration: Integrating new equipment with existing systems if applicable. Compliance: Ensuring that the installation complies with safety standards, codes, and regulations.